Tag Archives: defrosting the freezer

Wedding Plans

18 Aug

I still haven’t nailed down The Bride on her wedding cake, although we did finally get a number, which is a start. I’ve selected several designs, none of which pleased her. She doesn’t like stripes or dots, but doesn’t want a plain cake, either.  She doesn’t want “ruffles” between the tiers, but kept insisting she wanted lace, instead. After a trip to the Wilton pages, I discovered that by “lace” she meant ribbon. The concept that “less is more” makes no sense to her at all. I did point out how much nicer the girls dresses looked after she had removed some of the gewgaws,  and she agreed so maybe there’s hope.

With all of the doctor’s appointments The Squire and I have coming up between now and Labor Day, I decided to get started on this project as soon as possible. When we remodeled the kitchen I gave all of my cake pans to a friend from church, with the understanding that he would let me use them in the event I needed them. I think they are out of town, as I haven’t gotten an answer to my emails. Their daughter is going to college, and they’ve probably driven her down to get settled in there.

So – today The Squire and I defrosted the big freezer, so we’d have space to put the cake. Piling boxes in the cooler, stacking things on the counter, tossing UFOs (Unidentified Frozen Objects), boiling water (you’d think we were having a baby!) and then replacing it all. Great fun.

We had a lovely well-balanced dinner of mini-pizzas, popcorn shrimp and chicken nuggets, along with a bag of frozen veggies. Grease and carbs. Yum!

When we were finished with the freezer, I leaned over to give The Squire a hug to thank him for helping me, and jerked back with a mighty YUCK!

Is there anybody else in the entire world who can work up a sweat defrosting a freezer?

 

Almost There!

8 Apr

The installation company said they would besewing room here between 8 and 10 this morning. The truck pulled into the drive at 7:55! Neither The Squire nor I were in any condition to receive visitors; he was in his BVDs and I hadn’t brushed my teeth or put on my “hat”, let along get out of my housecoat. You should have seen us scurry!

There was only one poor young man to do all the work, so The Squire lent a hand, as I had to go to church to do Altar Guild stuff. Heaven only knows how Lowe’s expected Israel (that was the fellow’s name) to lug a twelve foot wide roll of carpet through the house and up the stairs without help. He and The Squire apparently had quite an interesting conversation while they were working.  He said he had left Mexico because it is too dangerous to live there any more. The cartels come and tell you that you are going to work for them, or join the police force so they will have an “in” if they get arrested. If you refuse, they shoot you. “After I lost a second amigo, I decided to get out while I was still alive.” Makes Cleveland look like Paradise.

So, we have moved the bed, dresser, and my sewing machine back into the room. The walls are painted a colour called Artichoke, and the rug is a light silvery grey. We still have to hang the curtains, etc. but we can see the light at the end of the tunnel, and I don’t think it’s an on-coming train. The bookcases are to be delivered on Monday.

Next week, we hit the back room, defrosting the freezer and reorganizing the pantry. I had stocked up on canned goods in September in case we had a bad winter and the power went out, so I need to pack up those things to take to the food pantry, and then make space in the freezer for veggies and such.  The Squire mentioned in passing cleaning off the work bench back there (Not the workshop upstairs; that’s another nightmare.) but I’m letting that bear sleep.

All Things Work Together

6 Apr

On Monday, I ordered two bookcases to put in the guestroom, andSouth-Shore-Axess-71-Bookcase-7246768C was told they would be delivered on the 11th. Great service, but it meant something else to try to stuff into a corner, as the carpet wasn’t to be delivered until the 15th.

This morning, we got a call from Lowe’s saying the carpet had been received yesterday, and they would call tomorrow to set up an installation on Friday! So – we will have the carpet down, with the weekend to get most of the furniture back into place, and then on Monday and Tuesday we can get the bookcases set up, and get the rest of the stuff out of the workshop. I really would like to have molding around the tops of the bookcases, with bead board, etc. on the backs, so they will looks as if they were built in. We’ve put too much time, energy, and money into this project to cut corners at the last minute.

The Squire wants to take down the counter he’d built in the workshop back when he did computer repairs, but maybe I can convince him that would be a jolly good place for me to work on my miniatures.  Of course, that leaves the power saw down in the back room, and I have NO desire to bring that upstairs, with the sawdust and everything else that entails. We shall see.

And, of course, the freezer needs to be defrosted, desperately, and I’d like to be able to get the pantry straightened out.

All in good time. All in good time. Baby steps.