Tag Archives: MRIs

Surprise!

4 Mar

We woke up this morning to about an inch of snow! It’s been well above 40-F for the last few days, so it really didn’t amount to much, other than looking pretty on the trees and grass for a while. It was all gone by noon. Blazer thought it was lovely! The last snow we had was so deep he was buried, but this was just enough to “snovel” around and kick up his heels. Mind you, it’ll be Spring in two weeks, but the weather will do as it pleases.

Speaking of things doing as they please, Local Grandson called to tell us he and his wife are expecting a baby in early October. His mom’s birthday is the 5th, and that was the original due date, but now the doctor says it will probably be a bit later. I reminded him that babies, like the weather, and the economy, will do as they please. Apparently twins run in his wife’s family because he said he kept asking the doctor, “You’re sure there’s only one in there?” So now, we have four great-grandchildren, plus two-thirds and one-third.

Which doesn’t quite add up to a whole baby. Yet.

We’ve gotten two coats of paint on the ceiling, and it really looks good. We also put a coat on the trim.  I think that will look better done in gloss, but at least it has a base coat. I got some samples of green paint, and we sloshed those on the wall to see which one we liked best. The jury is still out on that. We have a lot more of that blasted textured paint to scrape off yet before we can get too involved in that part of the project.

The Structural Engineer recommended putting extra posts under the dormer, and The Squire took care of that Tuesday and Wednesday. Where there were three, there are now seven posts; I feel as if I’m looking through the bars of the Folsom County jail, and the dog has gotten his rope wrapped around them a couple of times, but the SE felt part of the problem with the wall under the window was the extra weight of the second floor, and this certainly ought to relieve that. The good news is that because all we are doing is making repairs and not new construction, we don’t need a permit. Thanks Be To God. This place wouldn’t pass any sort of inspection; there are no footers, and there’s not a square corner or level floor in the entire place.

The Squire had an MRI of his head a few days ago, and he spoke with the GP today. Apparently, he has an effusion of the mastoid on the right side. Haven’t a clue what that means, frankly, but MRI does show a lot of “stuff” on the right side of his head. He has an appointment with the ENT on the 17th, so maybe we’ll get some sort of answers. I told him he needed to look for zebras. If there’s something odd, either The Squire or I will have it.

My Head’s Not Screwed on Right

25 Aug

Well, anybody who knows me can attest to that, but now it’s official.

Over the last eight work days I have been to five different doctors, and it is getting wearisome. Most of these visits can pass unmentioned for the moment, but among my many complaints is the fact that my neck hurts, from the base of my skull down as far as my shoulder blades. A cervical MRI showed a narrowing between C-5 and C-6 that is obvious to any layperson who even glances at the films. The neurologist recommended surgery, sooner rather than later, so I will put my head on the chopping block on September 28th. A plastic replacement for the disc itself and a titanium plate to hold the entire business together.  All of which is MRI compatible, he assures me.

Recovery time? “Oh, you should be able to drive in about four weeks.” And I’ll bet that includes no strenuous activity, too.  Great.

According to my family history, I should live another fifteen or twenty years or so, and I can’t honestly say I’m really thrilled about the prospect.